| Barn Conversion Weeks 23 to 24 to 18th December Finished (on the inside) |
![]() |
| Still outside work to do though. |
![]() |
A couple of steps lead up into the hallway over the green slated floor showing part of the kitchen
including the built in cooker with extractor hood above Come in |
![]() | view back to entrance doorway with lounge window to left |
| view through lounge window
| ![]() |
![]() | from lounge through to kitchen |
| kitchen from hallway
| ![]() |
![]() | kitchen tile |
| kitchen cupboard
| ![]() |
![]() | master bedroom |
| ensuite
| ![]() |
![]() | part of ensuite |
| glass feature
| ![]() |
![]() | floor tiles laid throughout the building |
| Weeks 1-2 | Hit the links on the left to follow the construction |
| Back to main page | next page |