| Barn Conversion Weeks 14 and 15 to 16th October |
![]() | the first window to the en suite off the master bedroom |
|
second and third windows solid oak windows.... no expense spared | ![]() |
![]() | insulation backed plasterboard to walls |
|
plasterboard to kitchen 100mm of insulation on exterior wall! | ![]() |
![]() | en suite shower |
| another shower | ![]() |
![]() |